Projects Directory

The St. Francis Harbour River Restoration Project

Recipient: Mulgrave & Area Lakes Enhancement Association
Approved Amount: $5,000
Year Approved: 2012

In-steam structures (i.e. digger logs and/or deflectors) have been constructed at 18 sites.  As well, armouring of the adjacent banks in the close proximately of the structure has also been completed.  A number of debris jams have also been removed.  On average, the tributary is 7 metres wide with an average spacing between structures of 6 to 7 channel widths.

Contact: Bob MacDonald, 902-747-3290, macdonald.bob@ns.sympatico.ca